How the ground was built
The reports do not give a dated sequence beyond the 2021 start and the build of about four years. The steps below describe the work, not a calendar.
-
2021
The idea
Veenu Diwan, Ajay Thakur and Abhay Thakur, three friends and cricket lovers, begin work on the idea of a ground of their own at Padechi, near Mehli.
-
The hill side
Cutting into the slope
The site is a steep hillside, so the ground was made by heavy cutting into the hill on one side.
-
The valley side
Filling and levelling
On the other side the ground is built up with infill. More than 70,000 tipper loads of debris were moved in all.
-
Along the slope
Retaining walls
Retaining walls about 150 m long hold the ground in place. The reports give different heights for the walls, so no height is quoted here.
-
The surface
American grass
The playing area, about 120 m by 90 m, is laid with American grass, as reported by The News Himachal.
-
The time it took
About four years
From the first idea in 2021 to a finished ground, the build took about four years.
-
What comes next
Academy, hostel and Pro-HPCL
A residential cricket academy and a hostel are planned. Pro-HPCL Season 4 was set to be played here in April 2026.